{"id":4901,"date":"2026-06-09T18:35:00","date_gmt":"2026-06-09T16:35:00","guid":{"rendered":"https:\/\/steelelement.ee\/?page_id=4901"},"modified":"2026-09-22T09:35:47","modified_gmt":"2026-09-22T07:35:47","slug":"hampton-by-hilton-tartu-mnt-49","status":"publish","type":"page","link":"https:\/\/steelelement.ee\/en\/hampton-by-hilton-tartu-mnt-49\/","title":{"rendered":"Hampton by Hilton Hotel \u2014 Tartu mnt 49, Tallinn"},"content":{"rendered":"\n\n\n<div class=\"se-detail-hero\" style=\"background:#007480;padding:60px 20px;text-align:center;color:#fff;\">\n<h1 style=\"margin:0 0 10px;font-size:2em;color:#fff;\">Hampton by Hilton Hotel<\/h1>\n<p style=\"margin:0;opacity:0.85;font-size:1.1em;\">Tartu mnt 49, Tallinn | Merko Ehitus Eesti AS | EXC2 | 2024<\/p>\n<\/div>\n<div class=\"se-detail-body\" style=\"max-width:900px;margin:40px auto;padding:0 20px;\">\n<div style=\"border-radius:8px;overflow:hidden;height:auto;background:#fff;\">\n<img decoding=\"async\" src=\"https:\/\/steelelement.ee\/wp-content\/uploads\/2026\/05\/Hampton_TT_EK-9-301_3dVaadeTeraskarkass_2024-02-06-scaled.jpg\" alt=\"Hotell \" hampton=\"\" by=\"\" hilton\"\"=\"\" style=\"width:100%;height:auto;display:block;\">\n<\/div>\n<div class=\"se-detail-specs\" style=\"display:flex;gap:0;margin:0 0 40px;background:#111;border-radius:0 0 8px 8px;overflow:hidden;\">\n<div class=\"spec-item\" style=\"flex:1;text-align:center;padding:18px 10px;border-right:1px solid #333;color:#fff;font-size:1.3em;font-weight:700;\">80 t<span style=\"display:block;font-size:0.55em;font-weight:400;opacity:0.7;color:#fff;margin-top:4px;\">Steel structures<\/span><\/div>\n<div class=\"spec-item\" style=\"flex:1;text-align:center;padding:18px 10px;border-right:1px solid #333;color:#4ab3c8;font-size:1.3em;font-weight:700;\">EXC2<span style=\"display:block;font-size:0.55em;font-weight:400;opacity:0.7;color:#fff;margin-top:4px;\">Execution class<\/span><\/div>\n<div class=\"spec-item\" style=\"flex:1;text-align:center;padding:18px 10px;border-right:1px solid #333;color:#4ab3c8;font-size:1.3em;font-weight:700;\">Tallinn<span style=\"display:block;font-size:0.55em;font-weight:400;opacity:0.7;color:#fff;margin-top:4px;\">Location<\/span><\/div>\n<div class=\"spec-item\" style=\"flex:1;text-align:center;padding:18px 10px;color:#4ab3c8;font-size:1.3em;font-weight:700;\">2024<span style=\"display:block;font-size:0.55em;font-weight:400;opacity:0.7;color:#fff;margin-top:4px;\">Year completed<\/span><\/div>\n<\/div>\n<h2>Project Overview<\/h2>\n<p>Steel Element O\u00dc fabricated, surface-treated and delivered the steel structures for the Hampton by Hilton hotel at Tartu mnt 49, Tallinn, Estonia. The project comprised 80 tonnes of structural steel, compliant with EN 1090 execution class EXC2.<\/p>\n<h2>Project Details<\/h2>\n<ul>\n<li><strong>Location:<\/strong> Tartu mnt 49, Tallinn<\/li>\n<li><strong>Client:<\/strong> Merko Ehitus Eesti AS<\/li>\n<li><strong>Steel structure weight:<\/strong> 80 t<\/li>\n<li><strong>Execution class:<\/strong> EN 1090 EXC2<\/li>\n<li><strong>Surface treatment:<\/strong> Fire protection R60 + C3M and R90\u2013120 + C3M<\/li>\n<li><strong>Year:<\/strong> 2024<\/li>\n<\/ul>\n<h2>Scope of work<\/h2>\n<p>Fabrication and erection of steel structures to EXC2. C3M corrosion protection and fire protection painting R60+C3M and R90\u2013120+C3M to the specified requirements. Delivery and installation of the structures using heavy haulage and special lifting equipment.<\/p>\n<div style=\"background:#cceaec;border-left:5px solid #007480;padding:20px 24px;border-radius:4px;margin-bottom:30px;\">\n<strong style=\"color:#007480;\">Technical highlight:<\/strong> Individual welded beams exceeded 14 tonnes \u2014 the project required special planning and heavy-duty lifting equipment.\n<\/div>\n<h2>Photos from Site<\/h2>\n<div style=\"display:grid;grid-template-columns:1fr 1fr;gap:12px;margin-bottom:30px;\">\n<a href=\"https:\/\/steelelement.ee\/wp-content\/uploads\/2026\/05\/IMG_8007-scaled.jpg\" target=\"_blank\"><img decoding=\"async\" src=\"https:\/\/steelelement.ee\/wp-content\/uploads\/2026\/05\/IMG_8007-scaled.jpg\" alt=\"Hotell \" hampton=\"\" by=\"\" hilton\"=\"\" foto=\"\" 1\"=\"\" style=\"width:100%;height:220px;object-fit:cover;display:block;border-radius:4px;\"><\/a><br>\n<a href=\"https:\/\/steelelement.ee\/wp-content\/uploads\/2026\/05\/IMG_8005-scaled.jpg\" target=\"_blank\"><img decoding=\"async\" src=\"https:\/\/steelelement.ee\/wp-content\/uploads\/2026\/05\/IMG_8005-scaled.jpg\" alt=\"Hotell \" hampton=\"\" by=\"\" hilton\"=\"\" foto=\"\" 2\"=\"\" style=\"width:100%;height:220px;object-fit:cover;display:block;border-radius:4px;\"><\/a><br>\n<a href=\"https:\/\/steelelement.ee\/wp-content\/uploads\/2026\/05\/IMG_8006-scaled.jpg\" target=\"_blank\"><img decoding=\"async\" src=\"https:\/\/steelelement.ee\/wp-content\/uploads\/2026\/05\/IMG_8006-scaled.jpg\" alt=\"Hotell \" hampton=\"\" by=\"\" hilton\"=\"\" foto=\"\" 3\"=\"\" style=\"width:100%;height:220px;object-fit:cover;display:block;border-radius:4px;\"><\/a>\n<\/div>\n<div style=\"margin-top:40px;padding:30px;background:#007480;border-radius:8px;text-align:center;color:#fff;\">\n<h3 style=\"margin:0 0 10px;color:#fff;\">Interested in a similar project?<\/h3>\n<p style=\"margin:0 0 20px;opacity:0.9;\">Get in touch \u2014 we will find the best solution.<\/p>\n<p><a href=\"\/en\/contact\/\" style=\"background:#fff;color:#007480;padding:12px 30px;border-radius:4px;text-decoration:none;font-weight:600;\">Contact us<\/a>\n<\/p><\/div>\n<\/div>\n\n","protected":false},"excerpt":{"rendered":"<p>Hampton by Hilton Hotel Tartu mnt 49, Tallinn | Merko Ehitus Eesti AS | EXC2 | 2024 80 tSteel structures EXC2Execution class TallinnLocation 2024Year completed Project Overview Steel Element O\u00dc fabricated, surface-treated and delivered the steel structures for the Hampton by Hilton hotel at Tartu mnt 49, Tallinn, Estonia. The project comprised 80 tonnes of [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-4901","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/steelelement.ee\/en\/wp-json\/wp\/v2\/pages\/4901","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/steelelement.ee\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/steelelement.ee\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/steelelement.ee\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/steelelement.ee\/en\/wp-json\/wp\/v2\/comments?post=4901"}],"version-history":[{"count":6,"href":"https:\/\/steelelement.ee\/en\/wp-json\/wp\/v2\/pages\/4901\/revisions"}],"predecessor-version":[{"id":5224,"href":"https:\/\/steelelement.ee\/en\/wp-json\/wp\/v2\/pages\/4901\/revisions\/5224"}],"wp:attachment":[{"href":"https:\/\/steelelement.ee\/en\/wp-json\/wp\/v2\/media?parent=4901"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}