{"id":5018,"date":"2026-09-18T10:56:40","date_gmt":"2026-09-18T08:56:40","guid":{"rendered":"https:\/\/steelelement.ee\/?page_id=5018"},"modified":"2026-09-21T19:05:20","modified_gmt":"2026-09-21T17:05:20","slug":"steel-structure-manufacturing","status":"publish","type":"page","link":"https:\/\/steelelement.ee\/en\/steel-structure-manufacturing\/","title":{"rendered":"Steel structure manufacturing"},"content":{"rendered":"<div style=\"background:#007480;padding:56px 20px;text-align:center;color:#fff;\">\n<h1 style=\"margin:0 0 12px;font-size:2.1em;color:#fff;line-height:1.2;\">Steel structure manufacturing in Tallinn<\/h1>\n<p style=\"margin:0;font-size:1.15em;opacity:.9;\">Load-bearing steel frames for industrial, commercial and warehouse buildings. Our own plant, our own EN 1090-2 certificate.<\/p>\n<\/div>\n<div style=\"display:flex;flex-wrap:wrap;background:#111;color:#fff;text-align:center;margin:0 0 34px;\">\n<div style=\"flex:1 1 180px;padding:22px 14px;border-right:1px solid #2a2a2a;\">\n<div style=\"font-size:1.45em;font-weight:700;color:#fff;line-height:1.15;\">300 t<\/div>\n<div style=\"font-size:.85em;opacity:.7;margin-top:6px;\">output per month<\/div>\n<\/div>\n<div style=\"flex:1 1 180px;padding:22px 14px;border-right:1px solid #2a2a2a;\">\n<div style=\"font-size:1.45em;font-weight:700;color:#fff;line-height:1.15;\">up to EXC 3<\/div>\n<div style=\"font-size:.85em;opacity:.7;margin-top:6px;\">EN 1090-2 execution class<\/div>\n<\/div>\n<div style=\"flex:1 1 180px;padding:22px 14px;border-right:1px solid #2a2a2a;\">\n<div style=\"font-size:1.45em;font-weight:700;color:#fff;line-height:1.15;\">20 t<\/div>\n<div style=\"font-size:.85em;opacity:.7;margin-top:6px;\">maximum element weight<\/div>\n<\/div>\n<div style=\"flex:1 1 180px;padding:22px 14px;border-right:1px solid #2a2a2a;\">\n<div style=\"font-size:1.45em;font-weight:700;color:#fff;line-height:1.15;\">up to C5<\/div>\n<div style=\"font-size:.85em;opacity:.7;margin-top:6px;\">corrosion protection<\/div>\n<\/div>\n<\/div>\n<p style=\"font-size:1.05em;\">Work starts from your drawing and ends with a marked, painted and documented structure on site. No middlemen \u2014 fabrication takes place in our own plant.<\/p>\n<h2 style=\"color:#4ab3c8;margin:38px 0 14px;\">Production facility<\/h2>\n<table style=\"width:100%;border-collapse:collapse;font-size:.97em;\">\n<tr>\n<td style=\"padding:10px 14px;border-bottom:1px solid #e6eef0;font-weight:600;width:42%;\">Floor area<\/td>\n<td style=\"padding:10px 14px;border-bottom:1px solid #e6eef0;\">2500 m\u00b2<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:10px 14px;border-bottom:1px solid #e6eef0;font-weight:600;width:42%;\">Overhead cranes<\/td>\n<td style=\"padding:10px 14px;border-bottom:1px solid #e6eef0;\">3 units, 10 t capacity, 7 m hook height<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:10px 14px;border-bottom:1px solid #e6eef0;font-weight:600;width:42%;\">Maximum element weight<\/td>\n<td style=\"padding:10px 14px;border-bottom:1px solid #e6eef0;\">20 t<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:10px 14px;border-bottom:1px solid #e6eef0;font-weight:600;width:42%;\">Welding machines<\/td>\n<td style=\"padding:10px 14px;border-bottom:1px solid #e6eef0;\">25 units \u2014 MIG\/MAG, TIG, MMA, including stainless steel<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:10px 14px;border-bottom:1px solid #e6eef0;font-weight:600;width:42%;\">Certified welders<\/td>\n<td style=\"padding:10px 14px;border-bottom:1px solid #e6eef0;\">10, EN ISO 9606-1<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:10px 14px;border-bottom:1px solid #e6eef0;font-weight:600;width:42%;\">Band saws<\/td>\n<td style=\"padding:10px 14px;border-bottom:1px solid #e6eef0;\">2 units, cross-section up to 700 mm<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:10px 14px;border-bottom:1px solid #e6eef0;font-weight:600;width:42%;\">Cutting<\/td>\n<td style=\"padding:10px 14px;border-bottom:1px solid #e6eef0;\">manual plasma and gas cutting<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:10px 14px;border-bottom:1px solid #e6eef0;font-weight:600;width:42%;\">Edge treatment<\/td>\n<td style=\"padding:10px 14px;border-bottom:1px solid #e6eef0;\">bending and bevelling<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:10px 14px;border-bottom:1px solid #e6eef0;font-weight:600;width:42%;\">Blasting and paint chamber<\/td>\n<td style=\"padding:10px 14px;border-bottom:1px solid #e6eef0;\">5 \u00d7 15 m, height 4 m<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:10px 14px;border-bottom:1px solid #e6eef0;font-weight:600;width:42%;\">Surface preparation<\/td>\n<td style=\"padding:10px 14px;border-bottom:1px solid #e6eef0;\">Sa 2,5 \/ Sa 3<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:10px 14px;border-bottom:1px solid #e6eef0;font-weight:600;width:42%;\">Corrosion protection<\/td>\n<td style=\"padding:10px 14px;border-bottom:1px solid #e6eef0;\">up to class C5<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:10px 14px;border-bottom:1px solid #e6eef0;font-weight:600;width:42%;\">Capacity<\/td>\n<td style=\"padding:10px 14px;border-bottom:1px solid #e6eef0;\">up to 300 t per month<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:10px 14px;border-bottom:1px solid #e6eef0;font-weight:600;width:42%;\">Team<\/td>\n<td style=\"padding:10px 14px;border-bottom:1px solid #e6eef0;\">35 people<\/td>\n<\/tr>\n<\/table>\n<h2 style=\"color:#4ab3c8;margin:38px 0 14px;\">Certificates covering fabrication<\/h2>\n<p><strong>EN 1090-2:2018+A1:2024, execution class up to EXC 3.<\/strong> Certificate holder ISM O\u00dc, issued by T\u00dcV Eesti O\u00dc (notified body 1526), certificate no. 1526-CPR-1090-1.0122.T\u00dcVEESTI.2025.000, valid until 27.10.2028. EXC 3 covers structures whose failure has significant consequences \u2014 large industrial buildings, high-rise buildings, energy facilities.<\/p>\n<p><strong>EN ISO 3834-2:2021<\/strong> \u2014 comprehensive quality requirements for welding. Process 135 (MAG), material groups 1.1, 1.2, 1.4 and 3.2. Welding engineer Pavel Kopanev, IWE.<\/p>\n<p><strong>EN ISO 9001:2015<\/strong> \u2014 Steel Element O\u00dc, T\u00dcV NORD CERT GmbH, certificate no. 44 100 222713, valid until 08.01.2029.<\/p>\n<p><strong>EPD<\/strong> \u2014 environmental product declaration, increasingly requested in public procurement and on LEED\/BREEAM projects.<\/p>\n<p><a href=\"\/en\/certificates\/\" style=\"font-weight:600;\"><span style=\"color:#4ab3c8;\">See all certificates with PDF files \u2192<\/span><\/a><\/p>\n<h2 style=\"color:#4ab3c8;margin:38px 0 14px;\">Surface treatment<\/h2>\n<p>A blasting and paint chamber of 5 \u00d7 15 \u00d7 4 m allows whole elements to be treated without cutting them into sections. Surface preparation <strong>Sa 2,5 or Sa 3<\/strong> to EN ISO 8501-1, coatings up to corrosivity category <strong>C5<\/strong> to EN ISO 12944.<\/p>\n<p>In practice this means a project requiring C3M or C4 needs no subcontracting \u2014 the whole cycle stays in one chain under one responsibility.<\/p>\n<h2 style=\"color:#4ab3c8;margin:38px 0 14px;\">What you receive with the structure<\/h2>\n<ul style=\"line-height:1.9;\">\n<li>CE marking and Declaration of Performance (DoP)<\/li>\n<li>Material certificates 3.1 to EN 10204<\/li>\n<li>Welder qualification certificates<\/li>\n<li>Welding procedure specifications (WPS\/WPQR)<\/li>\n<li>Dimensional and coating inspection reports<\/li>\n<li>Assembly drawings and marking plans<\/li>\n<\/ul>\n<p>The documentation package follows the execution class of the project. EXC 3 requirements are considerably stricter than EXC 2 \u2014 this is stated in the quotation from the start, not added later as an extra.<\/p>\n<h2 style=\"color:#4ab3c8;margin:38px 0 14px;\">Who does the manufacturing<\/h2>\n<p>Steel Element O\u00dc (Tuukri 54, Tallinn) handles sales, client work and design. Fabrication, welding and surface treatment are carried out by <strong>ISM O\u00dc<\/strong> (Linnuka tee 5, J\u00f5el\u00e4htme parish). Both companies have the same owner and work as one team \u2014 the EN 1090-2 certificate is issued to our own production company, not to a third party.<\/p>\n<h2 style=\"color:#4ab3c8;margin:44px 0 6px;\">Frequently asked questions<\/h2>\n<h3 style=\"color:#fff;margin:26px 0 8px;font-size:1.08em;\">How quickly will I get a quote?<\/h3>\n<p style=\"margin:0;opacity:.9;\">We send a preliminary quote within 1\u20133 working days. Drawings in PDF, DWG or IFC are enough to start \u2014 if needed, a sketch with an approximate scope will do.<\/p>\n<h3 style=\"color:#fff;margin:26px 0 8px;font-size:1.08em;\">What is the smallest order you accept?<\/h3>\n<p style=\"margin:0;opacity:.9;\">We work from one tonne up to large industrial projects. A small scope does not mean simpler documentation \u2014 CE marking and the declaration of performance come with every order.<\/p>\n<h3 style=\"color:#fff;margin:26px 0 8px;font-size:1.08em;\">Up to which execution class do you fabricate?<\/h3>\n<p style=\"margin:0;opacity:.9;\">Up to EXC 3. The EN 1090-2:2018+A1:2024 certificate was issued by T\u00dcV Eesti O\u00dc (notified body 1526), no. 1526-CPR-1090-1.0122.T\u00dcVEESTI.2025.000, valid until 27.10.2028.<\/p>\n<h3 style=\"color:#fff;margin:26px 0 8px;font-size:1.08em;\">Is surface treatment done in-house or subcontracted?<\/h3>\n<p style=\"margin:0;opacity:.9;\">In our own booth. Dimensions 5 \u00d7 15 m, height 4 m \u2014 elements do not need to be cut into parts. Blast cleaning to Sa 2.5 or Sa 3, coatings up to corrosivity category C5.<\/p>\n<h3 style=\"color:#fff;margin:26px 0 8px;font-size:1.08em;\">How much can you produce per month?<\/h3>\n<p style=\"margin:0;opacity:.9;\">Up to 300 tonnes per month. 2,500 m\u00b2 of production floor, three 10-tonne overhead cranes, 25 welding machines and 10 certified welders.<\/p>\n<h3 style=\"color:#fff;margin:26px 0 8px;font-size:1.08em;\">Which documents do I receive with the structure?<\/h3>\n<p style=\"margin:0;opacity:.9;\">CE marking and declaration of performance, EN 10204 3.1 material certificates, welder qualification certificates, welding procedure specifications (WPS\/WPQR), dimensional and coating inspection reports, assembly drawings and marking plans.<\/p>\n<h3 style=\"color:#fff;margin:26px 0 8px;font-size:1.08em;\">Do you also erect?<\/h3>\n<p style=\"margin:0;opacity:.9;\">Yes, with our own erection crews. <a href=\"\/en\/steel-structure-erection\/\" style=\"font-weight:600;\"><span style=\"color:#4ab3c8;\">See steel structure erection \u2192<\/span><\/a><\/p>\n<h3 style=\"color:#fff;margin:26px 0 8px;font-size:1.08em;\">What warranty do you provide?<\/h3>\n<p style=\"margin:0;opacity:.9;\">Warranty and liability for defects in accordance with the laws of the Republic of Estonia. The warranty period and terms are agreed and set out in the contract.<\/p>\n<div style=\"background:#007480;color:#fff;padding:34px 24px;text-align:center;margin:44px 0 0;border-radius:4px;\">\n<h2 style=\"color:#fff;margin:0 0 10px;\">Request a quotation from your drawing<\/h2>\n<p style=\"margin:0 0 18px;opacity:.9;\">Send drawings \u2014 PDF, DWG or IFC. A sketch with tonnage is enough to start.<\/p>\n<p style=\"margin:0;\"><a href=\"\/en\/contact\/\" style=\"background:#fff;padding:13px 30px;border-radius:3px;font-weight:700;text-decoration:none;display:inline-block;\"><span style=\"color:#007480;\">Send drawings \u2192<\/span><\/a><\/p>\n<p style=\"margin:14px 0 0;font-size:.92em;opacity:.85;\">We send a preliminary quotation within <strong>1\u20133 working days<\/strong>.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Steel structure manufacturing in Tallinn Load-bearing steel frames for industrial, commercial and warehouse buildings. Our own plant, our own EN 1090-2 certificate. 300 t output per month up to EXC 3 EN 1090-2 execution class 20 t maximum element weight up to C5 corrosion protection Work starts from your drawing and ends with a marked, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-5018","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/steelelement.ee\/en\/wp-json\/wp\/v2\/pages\/5018","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/steelelement.ee\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/steelelement.ee\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/steelelement.ee\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/steelelement.ee\/en\/wp-json\/wp\/v2\/comments?post=5018"}],"version-history":[{"count":2,"href":"https:\/\/steelelement.ee\/en\/wp-json\/wp\/v2\/pages\/5018\/revisions"}],"predecessor-version":[{"id":5211,"href":"https:\/\/steelelement.ee\/en\/wp-json\/wp\/v2\/pages\/5018\/revisions\/5211"}],"wp:attachment":[{"href":"https:\/\/steelelement.ee\/en\/wp-json\/wp\/v2\/media?parent=5018"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}