{"id":5020,"date":"2026-09-18T10:58:17","date_gmt":"2026-09-18T08:58:17","guid":{"rendered":"https:\/\/steelelement.ee\/?page_id=5020"},"modified":"2026-09-21T19:05:20","modified_gmt":"2026-09-21T17:05:20","slug":"steel-structure-erection","status":"publish","type":"page","link":"https:\/\/steelelement.ee\/en\/steel-structure-erection\/","title":{"rendered":"Steel structure erection"},"content":{"rendered":"<div style=\"background:#007480;padding:56px 20px;text-align:center;color:#fff;\">\n<h1 style=\"margin:0 0 12px;font-size:2.1em;color:#fff;line-height:1.2;\">Steel structure erection<\/h1>\n<p style=\"margin:0;font-size:1.15em;opacity:.9;\">Our own erection crews. Fabrication and installation under one responsibility.<\/p>\n<\/div>\n<div style=\"display:flex;flex-wrap:wrap;background:#111;color:#fff;text-align:center;margin:0 0 34px;\">\n<div style=\"flex:1 1 180px;padding:22px 14px;border-right:1px solid #2a2a2a;\">\n<div style=\"font-size:1.45em;font-weight:700;color:#fff;line-height:1.15;\">Own crews<\/div>\n<div style=\"font-size:.85em;opacity:.7;margin-top:6px;\">not subcontracted per project<\/div>\n<\/div>\n<div style=\"flex:1 1 180px;padding:22px 14px;border-right:1px solid #2a2a2a;\">\n<div style=\"font-size:1.45em;font-weight:700;color:#fff;line-height:1.15;\">up to EXC 3<\/div>\n<div style=\"font-size:.85em;opacity:.7;margin-top:6px;\">EN 1090-2 applies to erection too<\/div>\n<\/div>\n<div style=\"flex:1 1 180px;padding:22px 14px;border-right:1px solid #2a2a2a;\">\n<div style=\"font-size:1.45em;font-weight:700;color:#fff;line-height:1.15;\">Estonia and Scandinavia<\/div>\n<div style=\"font-size:.85em;opacity:.7;margin-top:6px;\">and elsewhere in Europe<\/div>\n<\/div>\n<div style=\"flex:1 1 180px;padding:22px 14px;border-right:1px solid #2a2a2a;\">\n<div style=\"font-size:1.45em;font-weight:700;color:#fff;line-height:1.15;\">600+ orders<\/div>\n<div style=\"font-size:.85em;opacity:.7;margin-top:6px;\">since 2018<\/div>\n<\/div>\n<\/div>\n<p style=\"font-size:1.05em;\">We erect steel frames for industrial, commercial and warehouse buildings. Installation is carried out by our own crews \u2014 the same people who make up our 35-strong team.<\/p>\n<h2 style=\"color:#4ab3c8;margin:38px 0 14px;\">Why this matters<\/h2>\n<p>When one company fabricates the structure and another installs it, a line of responsibility appears. A dimension does not match \u2014 and the argument about whose fault it is begins. In our case there is no such line: fabrication and erection are one chain and one responsibility.<\/p>\n<p>The practical result: no adjustment on site. Parts arrive at the correct dimension and go together without cutting or re-welding.<\/p>\n<h2 style=\"color:#4ab3c8;margin:38px 0 14px;\">What erection includes<\/h2>\n<ul style=\"line-height:1.9;\">\n<li>Erection of the load-bearing steel frame \u2014 columns, beams, trusses, bracing<\/li>\n<li>Lifting plan and arrangement of cranes on site<\/li>\n<li>Tightening and inspection of bolted connections<\/li>\n<li>On-site welding by certified welders<\/li>\n<li>Surveying and geodetic control<\/li>\n<li>Post-installation documentation and handover<\/li>\n<\/ul>\n<p>Cranes are hired for each project individually, based on the weight and reach of the elements \u2014 so the client does not pay for equipment the project does not need.<\/p>\n<h2 style=\"color:#4ab3c8;margin:38px 0 14px;\">The execution class applies to erection as well<\/h2>\n<p>EN 1090-2 does not stop at the factory gate. Execution class <strong>up to EXC 3<\/strong> also covers installation: dimensional tolerances, bolt tightening torque, requirements for on-site welding and the extent of inspection are all defined by the class.<\/p>\n<p>So if the project specifies EXC 3, the erection must meet EXC 3 requirements too \u2014 and we hold a certificate for that, not just a promise.<\/p>\n<p><a href=\"\/en\/certificates\/\" style=\"font-weight:600;\"><span style=\"color:#4ab3c8;\">See certificates with numbers and validity dates \u2192<\/span><\/a><\/p>\n<h2 style=\"color:#4ab3c8;margin:38px 0 14px;\">Where we work<\/h2>\n<p>In Estonia \u2014 Tallinn, Tartu, P\u00e4rnu, Narva and smaller towns and parishes. Outside Estonia we work regularly in Scandinavia and the Baltics as a partner to large international construction companies.<\/p>\n<h2 style=\"color:#4ab3c8;margin:38px 0 14px;\">Examples of completed projects<\/h2>\n<ul style=\"line-height:1.9;\">\n<li>Commercial building, Reti tee 3, Peetri \u2014 92 t, EXC2, R30 + C2M, client NOBE O\u00dc<\/li>\n<li>Nerostein IV production building extension, Tammi tee 71 \u2014 120 t, EXC2, C3M, client Combicon O\u00dc<\/li>\n<\/ul>\n<p><a href=\"\/en\/projects\/\" style=\"font-weight:600;\"><span style=\"color:#4ab3c8;\">See all projects \u2192<\/span><\/a><\/p>\n<h2 style=\"color:#4ab3c8;margin:44px 0 6px;\">Frequently asked questions<\/h2>\n<h3 style=\"color:#fff;margin:26px 0 8px;font-size:1.08em;\">Is erection done by your own people?<\/h3>\n<p style=\"margin:0;opacity:.9;\">Yes. Our erectors are part of our 35-person team; we do not subcontract erection project by project. Fabrication and erection remain under one responsibility.<\/p>\n<h3 style=\"color:#fff;margin:26px 0 8px;font-size:1.08em;\">Do you own the cranes?<\/h3>\n<p style=\"margin:0;opacity:.9;\">We hire cranes for each project based on element weights and the required reach. That way the client does not pay for equipment the project does not need.<\/p>\n<h3 style=\"color:#fff;margin:26px 0 8px;font-size:1.08em;\">Does the EN 1090-2 execution class also apply to erection?<\/h3>\n<p style=\"margin:0;opacity:.9;\">Yes. The class defines dimensional tolerances, bolt tightening torque, requirements for site welding and the scope of inspection. Our fabrication and erection are certified up to EXC 3.<\/p>\n<h3 style=\"color:#fff;margin:26px 0 8px;font-size:1.08em;\">Where do you work?<\/h3>\n<p style=\"margin:0;opacity:.9;\">All over Estonia \u2014 Tallinn, Tartu, P\u00e4rnu, Narva and smaller towns and municipalities. Regularly also in Scandinavia and the Baltics, as a partner to large international construction companies.<\/p>\n<h3 style=\"color:#fff;margin:26px 0 8px;font-size:1.08em;\">What is handed over after erection?<\/h3>\n<p style=\"margin:0;opacity:.9;\">Dimensional and geodetic survey reports, bolted connection inspection results, site welding documentation and handover materials in line with the execution class.<\/p>\n<h3 style=\"color:#fff;margin:26px 0 8px;font-size:1.08em;\">How quickly will I get an erection quote?<\/h3>\n<p style=\"margin:0;opacity:.9;\">Within 1\u20133 working days. Send drawings or a description of the structure with the scope \u2014 PDF, DWG, IFC.<\/p>\n<h3 style=\"color:#fff;margin:26px 0 8px;font-size:1.08em;\">Do you fabricate as well?<\/h3>\n<p style=\"margin:0;opacity:.9;\">Yes, in our own plant. <a href=\"\/en\/steel-structure-manufacturing\/\" style=\"font-weight:600;\"><span style=\"color:#4ab3c8;\">See steel structure manufacturing \u2192<\/span><\/a><\/p>\n<h3 style=\"color:#fff;margin:26px 0 8px;font-size:1.08em;\">What warranty do you provide?<\/h3>\n<p style=\"margin:0;opacity:.9;\">Warranty and liability for defects in accordance with the laws of the Republic of Estonia. The warranty period and terms are agreed and set out in the contract.<\/p>\n<div style=\"background:#007480;color:#fff;padding:34px 24px;text-align:center;margin:44px 0 0;border-radius:4px;\">\n<h2 style=\"color:#fff;margin:0 0 10px;\">Request an erection quotation<\/h2>\n<p style=\"margin:0 0 18px;opacity:.9;\">Send drawings or a description of the structure with tonnage \u2014 PDF, DWG, IFC.<\/p>\n<p style=\"margin:0;\"><a href=\"\/en\/contact\/\" style=\"background:#fff;padding:13px 30px;border-radius:3px;font-weight:700;text-decoration:none;display:inline-block;\"><span style=\"color:#007480;\">Send drawings \u2192<\/span><\/a><\/p>\n<p style=\"margin:14px 0 0;font-size:.92em;opacity:.85;\">We send a preliminary quotation within <strong>1\u20133 working days<\/strong>.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Steel structure erection Our own erection crews. Fabrication and installation under one responsibility. Own crews not subcontracted per project up to EXC 3 EN 1090-2 applies to erection too Estonia and Scandinavia and elsewhere in Europe 600+ orders since 2018 We erect steel frames for industrial, commercial and warehouse buildings. Installation is carried out by [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-5020","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/steelelement.ee\/en\/wp-json\/wp\/v2\/pages\/5020","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/steelelement.ee\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/steelelement.ee\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/steelelement.ee\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/steelelement.ee\/en\/wp-json\/wp\/v2\/comments?post=5020"}],"version-history":[{"count":3,"href":"https:\/\/steelelement.ee\/en\/wp-json\/wp\/v2\/pages\/5020\/revisions"}],"predecessor-version":[{"id":5212,"href":"https:\/\/steelelement.ee\/en\/wp-json\/wp\/v2\/pages\/5020\/revisions\/5212"}],"wp:attachment":[{"href":"https:\/\/steelelement.ee\/en\/wp-json\/wp\/v2\/media?parent=5020"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}