Hammerjack Warehouse and Office Building — Peetri 5

Hammerjack warehouse and office building

Peetri 5, Alliku küla, Saue vald | Maru Ehitus AS | EXC2 | 2025

Hammerjack OÜ lao- ja büroohoone — Peetri 5, Alliku küla, Saue vald
42 t
Terase kaal
EXC2
EN 1090 klass
Saue vald
Asukoht
2025
Aasta

Project Overview

Steel Element OÜ fabricated, surface-treated and delivered the steel structures for the Hammerjack warehouse and office building at Peetri 5, Alliku küla, Saue vald, Estonia. The project comprised 42 tonnes of structural steel, compliant with EN 1090 execution class EXC2.

Project Details

  • Location: Peetri 5, Alliku küla, Saue vald
  • Client: Maru Ehitus AS
  • Steel structure weight: 42 t
  • Execution class: EN 1090 EXC2
  • Surface treatment: Fire protection R30 + C3M
  • Year: 2025

Scope of Work

Our scope included the fabrication, surface treatment and delivery of the steel structures to site, supplied with a full EN 1090 EXC2 documentation package (material certificates, welding procedure specifications and quality control protocols).

Photos from Site

Hammerjack OÜ laohoone Peetri 5 Saue vald teraskonstruktsioon 1 Hammerjack OÜ laohoone Peetri 5 Saue vald teraskonstruktsioon 2 Hammerjack OÜ laohoone Peetri 5 Saue vald teraskonstruktsioon 3 Hammerjack OÜ laohoone Peetri 5 Saue vald teraskonstruktsioon 4

Planeerite sarnast projekti?

Võtke meiega ühendust — esitame üksikasjaliku pakkumuse 48 tunni jooksul.

Küsi pakkumust →