Office and Warehouse Building — Härgmäe 20, Tallinn

Office and warehouse building

Härgmäe 20 / Mäeküla 4, Tallinn | Mitt & Perlebach OÜ | EXC2 | 2025

Büroo- ja laohoone — Härgmäe 20 / Mäeküla 4, Tallinn
75 t
Terase kaal
EXC2
EN 1090 klass
Tallinn
Asukoht
2025
Aasta

Project Overview

Steel Element OÜ fabricated, surface-treated and delivered the steel structures for an office and warehouse building at Härgmäe 20 / Mäeküla 4, Tallinn, Estonia. The project comprised 75 tonnes of structural steel, compliant with EN 1090 execution class EXC2.

Project Details

  • Location: Härgmäe 20 / Mäeküla 4, Tallinn
  • Client: Mitt & Perlebach OÜ
  • Steel structure weight: 75 t
  • Execution class: EN 1090 EXC2
  • Surface treatment: Fire protection R30 + C3M
  • Year: 2025

Scope of Work

Our scope included the fabrication, surface treatment and delivery of the steel structures to site, supplied with a full EN 1090 EXC2 documentation package (material certificates, welding procedure specifications and quality control protocols).

Photos from Site

Büroo- ja laohoone Härgmäe 20 Tallinn 1 Büroo- ja laohoone Härgmäe 20 Tallinn 2